×

AUTOMATED MODEL BUILDING AND BATCH MODEL BUILDING FOR A MANUFACTURING PROCESS, PROCESS MONITORING, AND FAULT DETECTION

  • US 20100057237A1
  • Filed: 09/02/2008
  • Published: 03/04/2010
  • Est. Priority Date: 09/02/2008
  • Status: Active Grant
First Claim
Patent Images

1. A method for creating a new model of a manufacturing process according to a multivariate analysis, the method comprising:

  • selecting a set of data representative of multidimensional data measured during a step or phase of a manufacturing process;

    determining a set of model generation conditions based on the set of data; and

    generating the new model specifying intervals for the multidimensional data measured during a future manufacturing process based on the set of model generation conditions.

View all claims
  • 9 Assignments
Timeline View
Assignment View
    ×
    ×