×

SYSTEM FOR THE OPERATIONAL ACTIVATION OF BANKING ATM NETWORKS AND METHOD FOR THE MANAGEMENT OF BANKING ATM EQUIPMENT NETWORK

  • US 20100070413A1
  • Filed: 07/08/2009
  • Published: 03/18/2010
  • Est. Priority Date: 07/11/2008
  • Status: Abandoned Application
First Claim
Patent Images

1. A “

  • SYSTEM FOR THE OPERATIONAL ACTIVATION OF BANKING ATM NETWORKS”

    , which foresees a quite efficient monitoring environment for managing networks with greater expeditiousness in the response to the service orders and which, besides that, allows for the company to optimize the activation of the field task force in the solicitation of technical assistance for the terminals and to elevate the productivity of the team, wherein it presents, in phase 1 [AsTO'"'"'s (9) availability control], a View of PA—

    decrease in the time of displacement;

    Automatic login, logout, and pausing—

    Issuing of indicators of hours worked by the AsTOs (9) for facilitating the management of the Consultants, Reduction in the length of time of login, Reduction in the renegotiation of calls;

    AsTO'"'"'s (9) work schedule in the ARS (4)—

    productivity increase of the Activators, Centralization of the functionalities in the ARS (4) for the utilization of the Consultant and of the Monitoring (2);

    Availability of WEB (7) for the third parties—

    Reduction in the length of activation time of third parties;

    in the phase 2—

    optimization of the activation, prioritization of the calls—

    activation with a focus on the business of the company, on the clients, and on the signed contracts;

    Relapse of calls—

    Automatic analysis of relapse of calls, differentiated treatment provided by the Operator to the call;

    Amount of activations—

    Optimization of the operational catering, optimization of the human resources;

    balancing—

    View by the ASTOS (9) activator, proactivity of the activator, recording of the balancing of calls;

    Onboard Diary—

    Better view of the history field;

    profile of catering—

    Greater certainty in the activation;

    profiled of the call x caterer;

    Summer time and world time—

    Grater ease for the activator, improvement in the communication between the activator and the operator;

    Closed Premises—

    Activation of calls in accordance with the type of catering, activation of calls only with the premises open;

    night activation—

    Indication of calls which had been originated in situations which took place during the early morning, activations of point enforcement, automatic indication for the activator pertinent to the need of performing a follow-up with the company of point enforcement;

    Control of the length of time of the calls—

    Time of displacement, time of operational catering, catering forecast;

    technical Assistance—

    Indicators of technical calls;

    time of duration, time elapsed for the delivery of the part, parts replaced, amount of technical calls;

    View of the waiting line of the Monitoring—

    Immediate adequation of the monitoring to the needs of operations, reduction in the waiting line to speak with monitoring, reports with indicators of productivity of the indicators;

    in phase 3, occurs the implementation of the chain of activation/Implementation of remote actions, chain of activation (including via radio/mobile phone, and e-mail)—

    Ease and expeditiousness in the chain of activation, generation of reports on the chains of activation performed;

    Windows remote actions (probe, counting test, and reset by sw)—

    Increase in the number of calls treated remotely and decrease in the time of the solution of the calls;

    Reports—

    Indicators of activation, treatment, and catering of the calls; and

    , in phase 4, automation of activation and remote actions (3), Automation of remote action—

    Expeditiousness in the realization of the remote action (3), in crease in the productivity of the activator, swiftness in the treatment of calls;

    Automatic activation—

    Increase in the productivity of the activator, Reduction in the time for activation.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×