×

Automated pricing and/or "Green" indicating method and system

  • US 20100324956A1
  • Filed: 06/15/2010
  • Published: 12/23/2010
  • Est. Priority Date: 01/17/2003
  • Status: Active Grant
First Claim
Patent Images

1. An automated system for creating one or a plurality of statements or indications, or a combination thereof, for one or a plurality of construction plan elements of a construction project that describes or indicates whether or not the construction plan elements fulfill one or a plurality of predetermined environmental or efficiency criteria or requirements, or both, and optionally one or a plurality of corresponding schedules comprising:

  • (a) one or a plurality of local or remote computers or consoles, or any combination thereof;

    (b) one or a plurality of local or remote servers, or any combination thereof;

    (c) an architectural, civil or industrial software design tool, wherein the software design tool provides on the computer, console or server a construction plan drawing having one or a plurality of construction plan elements;

    (d) a local server system or remote server system that maintains one or a plurality of databases including data or information, or both, for one or a plurality of the construction plan elements, wherein the data, information or both state or indicate, or both, whether or not the one or a plurality of construction plan elements fulfill one or a plurality of predetermined environmental or efficiency criteria, or both, and wherein an Intranet connection exists between the local server system and the computer or console or an Internet connection exists between the remote server system and the computer or console, or both; and

    (e) an add-on computer software code that runs as an internal component within the software design tool when executed on the computer, console or server or outside Of the software design tool operating as a dynamic link library, executable (.exe), ActiveX, COM object, or combination thereof;

    wherein the add-on computer software code optionally includes a palette, or uses an existing palette, that contains one or a plurality of parametric symbols that correspond with one or a plurality of the construction plan elements, and that optionally may be selected by a user for insertion into the construction plan drawing; and

    wherein the add-on computer software code, when executed by the computer, console, server, dynamic link library, executable (.exe), ActiveX, COM object, or a combination thereof;

    (i) optionally inserts one or a plurality of the construction plan elements, or of the parametric symbols that may optionally be selected by a user, or both, into the construction plan drawing;

    (ii) transmits via the Intranet connection, the Internet connection, or both, data or information, or both, corresponding to one or a plurality of construction plan elements or parametric symbols from the computer, console, server, dynamic link library, executable (.exe), ActiveX, COM object, or a combination thereof, to the local server system, the remote server system, or both, either directly or via an optional communication module;

    (iii) receives via the Intranet connection, the Internet connection, or both, from the local server system, the remote server system, or both, for one or a plurality of the construction plan elements or parametric symbols, or both, one or a plurality of statements or indications, or any combination thereof, describing or indicating whether or not the one or plurality of construction plan elements or parametric symbols, or both, fulfill one or a plurality of predetermined environmental or efficiency criteria or requirements, or both, either directly or via an optional communication module; and

    (iv) optionally, generates a schedule from the statements or indications, or any combination thereof, that includes one or a plurality of statements or other indications, or any combination thereof, for the one or plurality of construction plan elements or parametric symbols, or both, stating or indicating, or both, whether or not one or a plurality of construction plan elements or parametric symbols fulfill one or a plurality of predetermined environmental or efficiency criteria, or both.

View all claims
  • 4 Assignments
Timeline View
Assignment View
    ×
    ×