APPARATUS AND PROCESS FOR WELLBORE CHARACTERIZATION
First Claim
Patent Images
1. A process for wellbore characterization, the process comprising:
- separating, in a separation vessel, drilling mud from gas produced during drilling of a wellbore;
transporting the separated produced gas from the separation vessel to a downstream process;
measuring at least one of a temperature, a pressure, a mass flow rate, and a volumetric flow rate of the separated produced gas during transport using one or more sensors.
1 Assignment
0 Petitions
Accused Products
Abstract
An apparatus and a process for wellbore characterization are disclosed, including: separating, in a separation vessel, drilling mud from gas produced during drilling of a wellbore; transporting the separated produced gas from the separation vessel to a downstream process; and measuring at least one of a temperature, a pressure, a mass flow rate, and a volumetric flow rate of the separated produced gas during transport using one or more sensors. Properties of the gas separated from the mud may be used to determine characteristics of a wellbore.
22 Citations
23 Claims
-
1. A process for wellbore characterization, the process comprising:
-
separating, in a separation vessel, drilling mud from gas produced during drilling of a wellbore; transporting the separated produced gas from the separation vessel to a downstream process; measuring at least one of a temperature, a pressure, a mass flow rate, and a volumetric flow rate of the separated produced gas during transport using one or more sensors. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10)
-
-
11. A system for characterizing properties of a wellbore, the system comprising:
-
a separation vessel for separating drilling mud from gas produced during drilling of a wellbore; a fluid conduit for transporting the separated produced gas from the separation vessel to a downstream process; one or more sensors for measuring at least one of a temperature, a pressure, a mass flow rate, and a volumetric flow rate of the separated gas during transport in the fluid conduit. - View Dependent Claims (12, 13, 14, 15, 16, 17, 18)
-
-
19. A process for measuring carbon emissions during the drilling of a wellbore, the process comprising:
-
separating, in a separation vessel, drilling mud from gas produced during drilling of a wellbore; transporting the separated produced gas from the separation vessel to a downstream process; measuring at least one of a temperature, a pressure, a mass flow rate, and a volumetric flow rate of the separated produced gas during transport using a sensor; determining at least one of a standard volumetric flow rate and an average molecular weight of the separated produced gas based on the measuring. - View Dependent Claims (20, 21)
-
-
22. A system for measuring carbon emissions during the drilling of a wellbore, the process comprising:
-
a separation vessel for separating drilling mud from gas produced during drilling of a wellbore; a fluid conduit for transporting the separated produced gas from the separation vessel to a downstream process; one or more sensors for measuring at least one of a temperature, a pressure, a mass flow rate, and a volumetric flow rate of the separated gas during transport in the fluid conduit; and a computer device for at least one of transmitting, storing, and analyzing the measurements from the one or more sensors. - View Dependent Claims (23)
-
Specification