×

Testing Lifecycle

  • US 20120198421A1
  • Filed: 05/04/2011
  • Published: 08/02/2012
  • Est. Priority Date: 01/31/2011
  • Status: Active Grant
First Claim
Patent Images

1. A testing system comprising:

  • a processor; and

    a memory coupled to the processor, the memory comprising;

    an extraction module configured to extract at least one test case, from amongst a plurality of test cases, pertaining to at least one of a requirement associated with a first build, an incremental requirement and a modified requirement associated with an updated build; and

    an execution module configured to enable execution of the at least one test case extracted by the extraction module.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×