×

ENERGY CONSERVATION ANALYSIS SYSTEM

  • US 20120277924A1
  • Filed: 12/21/2010
  • Published: 11/01/2012
  • Est. Priority Date: 12/21/2009
  • Status: Active Grant
First Claim
Patent Images

1. An energy conservation analysis system for monitoring a device to be monitored, said device to be monitored is configured to operate according to a control schedule information, said energy conservation analysis system comprising:

  • a resource usage information acquisition means being configured to acquire an usage amount of resource in association with usage time, the usage amount of the resource indicating an amount of the resource used by the device to be monitored which is operated according to the control schedule information;

    a time slot setting means being configured to set three or more time slots which include a beneficial use time slot, a waste use time slot, and an efficiency improvement time slot, the beneficial use time slot is provided for regarding a use of resource in the beneficial use time slot as a beneficial use, the waste use time slot being provided for regarding a use of resource in the waste use time slot as a resource wasting, the efficiency improvement time slot being provided for regarding a use of resource in the efficiency improvement time slot as the resource that use of the resource is to be saved;

    a resource usage condition judgment means being configured to calculate an amount of the usage of the resource in each one of the beneficial use time slot, the waste use time slot, and the efficiency improvement time slot which are set by said time slot setting means on the basis of the resource usage information acquired by said resource usage information acquisition means,a display means being configured to display an amount of the usage of the resource in each one of the beneficial use time slot, the waste use time slot, and the efficiency improvement time, an amount of the usage of the resource in each one of the beneficial use time slot, the waste use time slot, and the efficiency improvement time being calculated by the resource usage condition judgment means.

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×