STARTUP BOOT CYCLE TESTING OF A MOBILE DEVICE AT DIMINISHED POWER SUPPLY CURRENT

  • US 20140210503A1
  • Filed: 08/21/2013
  • Published: 07/31/2014
  • Est. Priority Date: 08/31/2012
  • Status: Abandoned Application
First Claim
Patent Images

1. A startup boot cycle test system for testing a mobile multi-function device under test (DUT) that has a power manager and a main system processor, comprising:

  • an external power source to provide an input current to the power manager of the mobile multi-function DUT, wherein the power manager is to then provide a boot current, drawn from the input current, to the main system processor; and

    a tester device to cause a margin current to be drawn from the power manager so as to diminish the boot current that is being provided to the main system processor, the tester device to then determine if the main system processor successfully boots using the diminished boot current.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×