×

Method and Apparatus for Performing Energy Management in a Power Supply Grid

  • US 20150254787A1
  • Filed: 04/03/2013
  • Published: 09/10/2015
  • Est. Priority Date: 09/14/2012
  • Status: Active Grant
First Claim
Patent Images

1. An energy management system of a power supply grid (PSG), comprising:

  • at least one control unit (CU) connected to distributed energy resource controllers (ERC) of energy resources (ER) of said power supply grid (PSG) by means of a communication network (CNW),wherein said control unit (CU) monitors communication links (CL) between said control unit (CU) and the energy resource controllers (ERC) via said communication network (CNW),wherein said control unit (CU) is adapted to calculate a predicted operation behavior of an energy resource controlled (ERC) by an energy resource controller (ERC) if a loss of communication or a communication bandwidth limitation of the monitored communication link (CL) to said energy resource controller (ERC) is detected.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×