SYSTEM AND METHOD FOR PROVIDING A CONTINUOUS WELLBORE SURVEY
First Claim
1. A method for producing a continuous survey of a previously drilled portion of a wellbore, the method comprising:
- receiving a plurality of stationary survey measurements taken at a corresponding plurality of locations along the portion of the wellbore;
receiving at least one continuous survey comprising a plurality of continuous survey measurements taken between a pair of stationary survey measurements of the plurality of stationary survey measurements; and
combining the plurality of stationary survey measurements and the plurality of continuous survey measurements to produce the continuous survey of the portion of the wellbore.
1 Assignment
0 Petitions
Accused Products
Abstract
Systems and methods are provided for producing a continuous survey of a previously drilled portion of a wellbore. The method includes receiving a plurality of stationary survey measurements taken at a corresponding plurality of locations along the portion of the wellbore. The method further includes receiving at least one continuous survey including a plurality of continuous survey measurements taken between a pair of stationary survey measurements of the plurality of stationary survey measurements. The method further includes combining the plurality of stationary survey measurements and the plurality of continuous survey measurements to produce the continuous survey of the portion of the wellbore.
35 Citations
33 Claims
-
1. A method for producing a continuous survey of a previously drilled portion of a wellbore, the method comprising:
-
receiving a plurality of stationary survey measurements taken at a corresponding plurality of locations along the portion of the wellbore; receiving at least one continuous survey comprising a plurality of continuous survey measurements taken between a pair of stationary survey measurements of the plurality of stationary survey measurements; and combining the plurality of stationary survey measurements and the plurality of continuous survey measurements to produce the continuous survey of the portion of the wellbore. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 31)
-
-
16. A method for generating data for a continuous survey of a previously drilled portion of a wellbore, the method comprising:
-
taking a plurality of stationary survey measurements at a corresponding plurality of locations along the portion of the wellbore; and taking at least one continuous survey comprising a plurality of continuous survey measurements between a pair of stationary survey measurements of the plurality of stationary survey measurements. - View Dependent Claims (17, 18, 19, 20, 21, 22, 23, 24, 32)
-
-
25. A wellbore survey system comprising:
-
at least one first survey tool configured to perform stationary survey measurements at a first level of performance; and at least one second survey tool configured to perform continuous survey measurements at a second level of performance lower than the first level of performance. - View Dependent Claims (26, 27, 28, 29, 30, 33)
-
Specification