×

TRACKING OF BUILT COMPONENTS BY USING ID TAGS

  • US 20160189089A1
  • Filed: 12/27/2014
  • Published: 06/30/2016
  • Est. Priority Date: 12/27/2014
  • Status: Active Grant
First Claim
Patent Images

1. A method of tracking a plurality of built components of a building comprising:

  • (A) selecting a building component from a structural Building Information Model to be fabricated;

    selecting a number from a range of numbers;

    associating said selected number with said selected building component; and

    sending said selected number and a fabrication recipe associated with said selected building component for each building component to a fabrication facility to initiate a fabrication process;

    and(B) fabricating each said building component based on said structural Building Information Model of said building by using said fabrication recipe for each said building component;

    imprinting each said selected number on one said associated building component;

    attaching an ID tag to each said building component having said imprinted selected number;

    wherein said selected number imprinted on said associated building component and said attached ID tag comprises a pairing data for each said building component; and

    time stamping a timing of completion of fabrication of each said fabricated component.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×