DATA CENTER INTELLIGENT CONTROL AND OPTIMIZATION
First Claim
Patent Images
1. A method of controlling data center operations comprising:
- determining, by a data center infrastructure control system (“
DCICS”
) and based upon a first expression, a first operation and data collection points associated with data center assets;
generating, by the DCICS, machine code instructions based on the first expression, wherein the machine code instructions include instructions to obtain first point data and perform the first operation based upon the first point data, wherein the first point data is obtained from the data collection points;
executing, by the DCICS, the machine code instructions to produce a first result of the first operation;
determining, by the DCICS and based upon the first result, a first control instruction, wherein executing the first control instruction causes a change in an operational state of at least one of a data center asset and a data center.
2 Assignments
0 Petitions
Accused Products
Abstract
Systems and methods of monitoring, analyzing, optimizing and controlling data centers and data center operations are disclosed. The system includes data collection and storage hardware and software for harvesting operational data from data center assets and operations. Intelligent analysis and optimization software enables identification of optimization and/or control actions. Control software and hardware enables enacting a change in the operational state of data centers.
-
Citations
20 Claims
-
1. A method of controlling data center operations comprising:
-
determining, by a data center infrastructure control system (“
DCICS”
) and based upon a first expression, a first operation and data collection points associated with data center assets;generating, by the DCICS, machine code instructions based on the first expression, wherein the machine code instructions include instructions to obtain first point data and perform the first operation based upon the first point data, wherein the first point data is obtained from the data collection points; executing, by the DCICS, the machine code instructions to produce a first result of the first operation; determining, by the DCICS and based upon the first result, a first control instruction, wherein executing the first control instruction causes a change in an operational state of at least one of a data center asset and a data center. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19)
-
-
20. A data center infrastructure control system, comprising:
-
a memory in communication with a processor; the processor when executing a computer program for data center control performs operations comprising; determining, by the processor and based upon a first expression, a first operation and data collection points associated with data center assets; generating, by the processor, machine code instructions based on the first expression, wherein the machine code instructions include instructions to obtain first point data and perform the first operation based upon the first point data, wherein the first point data is obtained from the data collection points; executing, by the processor, the machine code instructions to produce a first result of the first operation; determining, by the processor and based upon the first result, a first control instruction, wherein executing the first control instruction causes a change in an operational state of at least one of a data center asset or a data center.
-
Specification