×

DATA CENTER INTELLIGENT CONTROL AND OPTIMIZATION

  • US 20160349716A1
  • Filed: 08/10/2016
  • Published: 12/01/2016
  • Est. Priority Date: 12/04/2008
  • Status: Active Application
First Claim
Patent Images

1. A method of controlling data center operations comprising:

  • determining, by a data center infrastructure control system (“

    DCICS”

    ) and based upon a first expression, a first operation and data collection points associated with data center assets;

    generating, by the DCICS, machine code instructions based on the first expression, wherein the machine code instructions include instructions to obtain first point data and perform the first operation based upon the first point data, wherein the first point data is obtained from the data collection points;

    executing, by the DCICS, the machine code instructions to produce a first result of the first operation;

    determining, by the DCICS and based upon the first result, a first control instruction, wherein executing the first control instruction causes a change in an operational state of at least one of a data center asset and a data center.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×