Control System for a Machine
First Claim
1. A system for controlling operation of a first material engaging work implement comprising:
- a first machine including;
an implement system having a linkage assembly including the first material engaging work implement;
a first machine pose sensor for generating first machine pose signals indicative of a pose of the first machine;
a second machine including;
a ground engaging drive mechanism to propel the second machine;
a second material engaging work implement; and
a controller configured to;
store a kinematic model and characteristics of the implement system of the first machine;
determine a second machine operation zone, the second machine operation zone being defined by a material movement plan of the second machine;
determine a current pose of the first machine based upon the first machine pose signals;
determine a first machine operation zone based upon the current pose of the first machine, the kinematic model and characteristics of the implement system, and the second machine operation zone, the first machine operation zone being spaced from the second machine operation zone; and
generate a plurality of command signals to move the first material engaging work implement within the first machine operation zone between a first position and a second position.
1 Assignment
0 Petitions
Accused Products
Abstract
A system for controlling operation of a first material engaging work implement includes a first machine, a second machine, and a controller. The controller is configured to store a kinematic model and characteristics of the implement system, determine a second machine operation zone, with the second machine operation zone being defined by a material movement plan of the second machine, and determine a current pose of the first machine. The controller is further configured to determine a first machine operation zone based upon the pose of the first machine, the kinematic model and characteristics of the implement system, and the second machine operation zone, with the first machine operation zone being spaced from the second machine operation zone, and generate a plurality of command signals to move the first material engaging work implement within the first machine operation zone between a first position and a second position.
7 Citations
20 Claims
-
1. A system for controlling operation of a first material engaging work implement comprising:
-
a first machine including; an implement system having a linkage assembly including the first material engaging work implement; a first machine pose sensor for generating first machine pose signals indicative of a pose of the first machine; a second machine including; a ground engaging drive mechanism to propel the second machine; a second material engaging work implement; and a controller configured to; store a kinematic model and characteristics of the implement system of the first machine; determine a second machine operation zone, the second machine operation zone being defined by a material movement plan of the second machine; determine a current pose of the first machine based upon the first machine pose signals; determine a first machine operation zone based upon the current pose of the first machine, the kinematic model and characteristics of the implement system, and the second machine operation zone, the first machine operation zone being spaced from the second machine operation zone; and generate a plurality of command signals to move the first material engaging work implement within the first machine operation zone between a first position and a second position. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15)
-
-
16. A method of controlling operation of a first material engaging work implement comprising:
-
providing a first machine including an implement system having a linkage assembly including the first material engaging work implement; providing a second machine including a ground engaging drive mechanism to propel the second machine and a second material engaging work implement; storing a kinematic model and characteristics of the implement system of the first machine; determining a second machine operation zone, the second machine operation zone being defined by a material movement plan of the second machine; determining a current pose of the first machine based upon first machine pose signals generated by a first machine pose sensor; determining a first machine operation zone based upon the current pose of the first machine, the kinematic model and characteristics of the implement system, and the second machine operation zone, the first machine operation zone being spaced from the second machine operation zone; and generating a plurality of command signals to move the first material engaging work implement within the first machine operation zone between a first position and a second position. - View Dependent Claims (17, 18, 19)
-
-
20. A machine for use with a second machine, the second machine including a ground engaging drive mechanism to propel the second machine, a second material engaging work implement, and a second machine operation zone defined by a material movement plan of the second machine, the machine comprising:
-
an implement system having a linkage assembly including a material engaging work implement; a machine pose sensor for generating machine pose signals indicative of a pose of the machine; and a controller configured to; store a kinematic model and characteristics of the implement system of the first machine; determine a current pose of the machine based upon the machine pose signals; determine a machine operation zone based upon the current pose of the machine, the kinematic model and characteristics of the implement system, and the second machine operation zone, the machine operation zone being spaced from the second machine operation zone; and generate a plurality of command signals to move the material engaging work implement within the machine operation zone between a dig location and a dump location.
-
Specification