Load Path Status Detection System
First Claim
Patent Images
1. A load path status detection system comprising:
- a primary fastener extending through a primary structural link;
a load sensor associated with the primary structural link;
the primary structural link that carries a load when a primary load path formed by the primary fastener and the primary structural link is functioning; and
a secondary structural link parallel to the primary structural link, wherein the secondary structural link does not carry the load when the primary load path is functioning.
1 Assignment
0 Petitions
Accused Products
Abstract
A load path status detection system comprising a primary fastener, a load sensor, a primary structural link, and a secondary structural link. The primary fastener extends through the primary structural link. The load sensor is associated with the primary structural link. The primary structural link carries a load when a primary load path, formed by the primary fastener and the primary structural link, is functioning. The secondary structural link is parallel to the primary structural link, wherein the secondary structural link does not carry a load when the primary load path is functioning.
9 Citations
19 Claims
-
1. A load path status detection system comprising:
-
a primary fastener extending through a primary structural link; a load sensor associated with the primary structural link; the primary structural link that carries a load when a primary load path formed by the primary fastener and the primary structural link is functioning; and a secondary structural link parallel to the primary structural link, wherein the secondary structural link does not carry the load when the primary load path is functioning. - View Dependent Claims (2, 3, 4, 5, 6, 7)
-
-
8. A method comprising:
-
connecting a primary structural link to a first component using a primary fastener to form a primary load path; generating a measurement using a load sensor associated with the primary structural link; and determining whether the primary load path is functioning using the measurement. - View Dependent Claims (9, 10, 11, 12, 13)
-
-
14. An assembly comprising:
-
a first component connected to a primary structural link using a primary fastener and connected to a pair of secondary structural links using a pair of secondary fasteners; a second component connected to the primary structural link using a connector; and a load sensor associated with the primary structural link and configured to measure a load on the primary structural link. - View Dependent Claims (15, 16, 17, 18, 19)
-
Specification