×

Distributed Resource Scheduling Based on Network Utilization

  • US 20180139148A1
  • Filed: 11/15/2016
  • Published: 05/17/2018
  • Est. Priority Date: 11/15/2016
  • Status: Active Grant
First Claim
Patent Images

1. A computer-implemented method for resource scheduling, the method comprising:

  • selecting, for placement of a powering-on virtual computing instance (VCI), a candidate set of hosts from a plurality of hosts in a cluster based on processor utilization and memory utilization;

    generating a network utilization ranking for each host in the candidate set of hosts based on network utilization associated with each host in the candidate set of hosts;

    selecting a host from the candidate set of hosts based on the generated network utilization rankings; and

    placing the powering-on VCI on the selected host.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×