METHOD AND LOADING MODULE TO MECHANICALLY INCREASE PILE/DRILLED SHAFT END BEARING STIFFNESS
First Claim
Patent Images
1. A method for increasing pile/drilled shaft end bearing stiffness, comprising:
- drilling a hole having a diameter of the pile/drilled shaft to a desired depth;
positioning at least one loading rod tube, at least one cement slurry tube and a loading module in the hole, wherein the loading module comprises a base plate with a lip and at least one seating opening;
positioning at least one loading rod down the loading rod tube so that it is seated within the at least one seating opening of the base plate;
securing a reaction frame to a pile/shaft body;
compressing the at least one loading rod so that it pushes the base plate into a bearing soil and creates a void between the base plate and bottom soil;
filling the void between the base plate and bottom soil with cement slurry;
removing the at least one loading rod; and
filling the loading tube with a cement slurry.
1 Assignment
0 Petitions
Accused Products
Abstract
Disclosed herein are a module, system and technique to enhance end bearing stiffness of pile/drilled shafts. In particular, methods, systems and loading modules which account for tip resistance in overall pile/shaft capacity are provided which increase the stiffness of the bearing soil. The techniques utilize a mechanical system to preload the soil under the shaft tip, thus allowing the users to confidently account for the gained resistance at an acceptable level of movement. Each shaft/pile is preloaded during construction to verify its load carrying capability.
7 Citations
14 Claims
-
1. A method for increasing pile/drilled shaft end bearing stiffness, comprising:
-
drilling a hole having a diameter of the pile/drilled shaft to a desired depth; positioning at least one loading rod tube, at least one cement slurry tube and a loading module in the hole, wherein the loading module comprises a base plate with a lip and at least one seating opening; positioning at least one loading rod down the loading rod tube so that it is seated within the at least one seating opening of the base plate; securing a reaction frame to a pile/shaft body; compressing the at least one loading rod so that it pushes the base plate into a bearing soil and creates a void between the base plate and bottom soil; filling the void between the base plate and bottom soil with cement slurry; removing the at least one loading rod; and filling the loading tube with a cement slurry. - View Dependent Claims (2, 3, 4, 5, 6, 7)
-
-
8. A system for increasing pile/drilled shaft end bearing stiffness, comprising:
-
a loading module comprising a base plate with a lip and at least one seating opening; one or more loading tubes for receiving one or more loading rods; one or more access tubes to deliver a cement slurry; and one or more anchoring rods. - View Dependent Claims (9, 10, 11, 12, 13, 14)
-
Specification