×

Managing Queue Distribution between Critical Datacenter and Flexible Datacenter

  • US 20200136388A1
  • Filed: 09/17/2019
  • Published: 04/30/2020
  • Est. Priority Date: 10/30/2018
  • Status: Active Grant
First Claim
Patent Images

1. A system comprising:

  • a flexible datacenter comprising;

    a power input system;

    a first computing system powered by the power input system;

    a queue system configured to organize a plurality of computational operations; and

    a second computing system configured to;

    determine, using the queue system, a computational operation for performance;

    determine whether to assign the computational operation for performance at the first computing system; and

    based on a determination to assign the computational operation for performance at the first computing system, assign the computational operation for performance at the first computing system.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×