×

Transportation systems

  • US 3,895,584 A
  • Filed: 02/06/1973
  • Issued: 07/22/1975
  • Est. Priority Date: 02/10/1972
  • Status: Expired due to Term
First Claim
Patent Images

1. A transportation system comprising a plurality of tracks and a plurality of remotely controllable vehicles constructed to run over the said tracks, wherein the said tracks comprise at least a first main track, a second main track, and a junction track by which vehicles may be driven from the first main track to the second main track, and the system also comprises first signalling means for sending control signals to vehicles on the first main track such that all vehicles on a continuous extended length thereof receive the same control signals to cause the said vehicles to proceed in a first regular traffic stream along the said first main track, means for sending signals to selected ones of the said vehicles to divert them on to the junction track, second signalling means for sending control signals to vehicles on the second main track such that all vehicles on a continuous extended length thereof receive the same control signals to cause the said vehicles to proceed in a second regular traffic stream along the said second main track, third signalling means for sending control signals to vehicles on the junction track to control their progress on the junction track and to make them responsive to signals derived from the second signalling means at selected times, further means for sending control signals derived from the second signalling means to vehicles on a part of the junction track to cause the said vehicles to match their speed to the speed of the said second regular traffic stream, a plurality of vehicle detector means for detecting the passage of vehicles on the first main track, the second main track, and the junction track and receiving data signals from the said vehicles, and computer means connected to the vehicle detector means and to the first, second and third signalling means for controlling the transfer of selected vehicles from the first main track to the second main track.

View all claims
  • 0 Assignments
Timeline View
Assignment View
    ×
    ×