Hydraulic fracturing and gravel packing method employing special sand control technique
First Claim
1. A method for completing a well that penetrates a subterranean oil or gas reservoir, comprising:
- (a) providing a borehole casing through said reservoir,(b) perforating said casing at preselected intervals therealong to form at least one set of longitudinal, in-line perforation tunnels,(c) locating a sand screen inside the casing and in juxtaposition with said perforation tunnels, a first annular section being formed between said sand screen and said casing,(d) locating a cross-over tool, having a first cross-over port, inside said casing and above said sand screen, a second annular section being formed between said cross-over tool and said casing,(e) locating a gravel packer, having a second cross-over port, inside said casing so as to form an isolating seal between said first and second annular sections, said second cross-over port being in fluid communication with said first cross-over port,(f) opening said first cross-over port in said cross-over tool and opening said second cross-over port in said gravel packing tool,(g) injecting a fracturing fluid containing a gravel packing sand down through said cross-over tool and out through said first and second cross-over ports into said first annular section, whereby said fracturing fluid is forced out of said first annular section through said perforation tunnels into said reservoir,(h) terminating the injection of said fracturing fluid when a vertical fracture communicating with said casing has been formed in said reservoir and said gravel packing sand has been screened out by the formation sand of said reservoir to the extent that said perforation tunnels and said first annular section of said casing are packed with said gravel packing sand,(i) removing said cross-over tool from inside said casing,(j) placing a producing tubing into said casing in fluid communication with said sand screen tubing, and(k) producing said oil or gas reservoir through said gravel packing sand and upward through said well casing by way of said sand screen and said production tubing.
1 Assignment
0 Petitions
Accused Products
Abstract
A production well is completed through a subterranean oil or gas reservoir. The well employs a well casing with perforation tunnels for fluid communication with the reservoir. A sand screen tubing is located in juxtaposition with the perforation tunnels with an annular section being formed between the casing and the sand screen tubing. A fracturing fluid and gravel packing sand is injected through the annular section and perforation tunnels into the reservoir. The injection is terminated when the fracture is complete and the perforation tunnels and annular section are filled with gravel packing sand. The oil or gas in the reservoir is then produced through the gravel packed well casing and the sand screen.
41 Citations
9 Claims
-
1. A method for completing a well that penetrates a subterranean oil or gas reservoir, comprising:
-
(a) providing a borehole casing through said reservoir, (b) perforating said casing at preselected intervals therealong to form at least one set of longitudinal, in-line perforation tunnels, (c) locating a sand screen inside the casing and in juxtaposition with said perforation tunnels, a first annular section being formed between said sand screen and said casing, (d) locating a cross-over tool, having a first cross-over port, inside said casing and above said sand screen, a second annular section being formed between said cross-over tool and said casing, (e) locating a gravel packer, having a second cross-over port, inside said casing so as to form an isolating seal between said first and second annular sections, said second cross-over port being in fluid communication with said first cross-over port, (f) opening said first cross-over port in said cross-over tool and opening said second cross-over port in said gravel packing tool, (g) injecting a fracturing fluid containing a gravel packing sand down through said cross-over tool and out through said first and second cross-over ports into said first annular section, whereby said fracturing fluid is forced out of said first annular section through said perforation tunnels into said reservoir, (h) terminating the injection of said fracturing fluid when a vertical fracture communicating with said casing has been formed in said reservoir and said gravel packing sand has been screened out by the formation sand of said reservoir to the extent that said perforation tunnels and said first annular section of said casing are packed with said gravel packing sand, (i) removing said cross-over tool from inside said casing, (j) placing a producing tubing into said casing in fluid communication with said sand screen tubing, and (k) producing said oil or gas reservoir through said gravel packing sand and upward through said well casing by way of said sand screen and said production tubing. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9)
-
Specification