×

Kiln controller

  • US 4,953,298 A
  • Filed: 02/24/1989
  • Issued: 09/04/1990
  • Est. Priority Date: 02/24/1989
  • Status: Expired due to Fees
First Claim
Patent Images

1. In a kiln controller for controlling the drying of lumber in a kiln, and comprising measuring means for measuring an evaporation rate of moisture in the lumber, and a computer controlling a schedule for drying the lumber, the schedule having a plurality of steps of variable duration, each step having temperature set points, a method comprising the steps of:

  • (a) comparing the measured evaporation rate to a desired evaporation rate,(b) adjusting the schedule in accordance with the comparison between the measured and desired evaporation rates, and(c) repeating (a) and (b) until the schedule is completed;

    wherein the kiln has a vent with a plurality of positions, and wherein measuring the evaporation rate comprises measuring a vent load of the vent, said vent load indicating the position of the vent.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×