×

Load management device and method of use

  • US 4,977,515 A
  • Filed: 08/29/1988
  • Issued: 12/11/1990
  • Est. Priority Date: 08/29/1988
  • Status: Expired due to Fees
First Claim
Patent Images

1. A load management system comprising a control device having means for establishing its electrical connection in series with an electric powered appliance, between said appliance and a source of electric power therefor, said device including a microprocessor, switch means coupled to said microprocessor under its control for controlling circuit completion and interruption between said source of electric power and said appliance, said microprocessor including clock means for maintaining real time, memory means coupled to said microprocessor for storing data furnished by said microprocessor, a battery coupled to at least said memory means for sustaining the memory capability of said memory means during interruption of power from said source of electric power, means for receiving electrical control signals from an external source for initiating commencement of either an ON interval or an OFF interval of allowable operation of said appliance, said microprocessor having been pre-programmed to perform a time-clock function of determining the duration of any such initiated interval, sensor means coupled to said microprocessor for sensing changes in the operation of said device, said microprocessor being pre-programmed to record the date and time of each change in its operating mode including each instance of change in programmed operation of said device, at least said memory means being housed in a removable plug-in structure whereby at least said memory means can be removed for independent down-loading of any data stored therein.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×