×

System and method for making staff schedules as a function of available resources as well as employee skill level, availability and priority

DC
  • US 5,111,391 A
  • Filed: 10/05/1989
  • Issued: 05/05/1992
  • Est. Priority Date: 10/05/1989
  • Status: Expired due to Term
First Claim
Patent Images

1. A system for processing a plurality of variables to create a staff schedule for a plurality of unique remote locations, said system including:

  • a memory divided into separate data files of information including tasks to be performed and scheduled, the sequence of the tasks, resources available, and employee skill levels, availability and priority;

    means coupled to said memory for storing and retrieving information in said memory;

    an input device for entering information indicative of projected daily business volume and for designating the tasks to be performed;

    generating means coupled to said memory and said input device for generating from the separate data files in said memory and from the information from said input device, schedules of tasks to be performed and the employees selected by availability by day of the week, employee skill levels, and employee priority or seniority, and minimum and maximum hours available per employee for establishing therefrom the shifts of employees by time interval and skill level requirements to perform the designated tasks, said generating means having placement logic for scheduling tasks and optimization logic for dividing the schedule into shifts according to skill levels; and

    a display coupled to said generating means, for displaying the schedules including the indications of the employees and tasks and the start and stop times therefor.

View all claims
  • 7 Assignments
Timeline View
Assignment View
    ×
    ×