Delayed coking cycle time reduction

  • US 5,891,310 A
  • Filed: 06/20/1997
  • Issued: 04/06/1999
  • Est. Priority Date: 06/20/1997
  • Status: Expired due to Term
First Claim
Patent Images

1. In a delayed coking process in which a pair of coke drums each supported by a skirt section welded to said drum are alternately filled and emptied, and in which the emptying portion of the cycle comprises the steps of:

  • (a) steaming out the filled coke drum to remove residual volatile matter from the drum;

    (b) quenching the hot coke bed with water;

    (c) draining quench water from the coke drum;

    (d) opening the top of the coke drum and drilling a pilot hole through the coke bed therein;

    (e) drilling out the coke from the coke bed between the pilot hole and the coke drum wall by radially directed drill water and removing the coke through an opening in the bottom of the coke drum;

    (f) closing the top and bottom openings of the coke drum; and

    (g) prior to introducing feed into the emptied drum, preheating the empty drum by passing hot coke drum vapors through the drum;

    the improvement wherein the thermal stresses at the junction of the coke drum and skirt are reduced by applying heat to the exterior portion of said coke drum adjacent the junction of the drum shell and the skirt of said drum prior to introducing hot feed oil into said drum, thereby preventing excessive thermal stresses.

View all claims