×

Seamless path switchover in a connection-oriented packet network

  • US 6,370,112 B1
  • Filed: 06/16/1998
  • Issued: 04/09/2002
  • Est. Priority Date: 06/16/1998
  • Status: Expired due to Term
First Claim
Patent Images

1. A method for use in a packet switching connection oriented network to move a connection between an upstream switch and a downstream switch from an original network path to a replacement network path, comprising the steps of:

  • a;

    the upstream switch selecting an arbitrary packet to be a last packet to be transmitted by the downstream switch of those that arrives at said downstream switch via the original path;

    b;

    the upstream switch sending all packets of the connection up to and including said selected packet over the original path and sending all subsequent packets over the replacement path;

    c;

    the upstream switch inserting a marker packet into a cell stream sent over the original path to indicate to the downstream switch the identity of the last data packet arriving from that path;

    d;

    the upstream switch providing the downstream switch a means to identify a first packet after said selected packet to arrive on the replacement path;

    e;

    the downstream switch, transmitting all packets arriving on the original path until the marker packet arrives on the original path, and discarding packets arriving on that original path after that original path marker packet;

    f;

    the downstream switch, buffering any packets, belonging after said selected packet, arriving on the replacement path before the marker packet arrives on the original path; and

    g;

    the downstream switch, when the marker packet arrives on the original path, transmitting in an order received, replacement path packets previously buffered, if any, and then transmitting subsequently arriving replacement path packets;

    h;

    whereby the integrity of a packet stream is maintained.

View all claims
  • 5 Assignments
Timeline View
Assignment View
    ×
    ×