×

Enhanced time-based proportional control

  • US 6,716,359 B1
  • Filed: 08/29/2000
  • Issued: 04/06/2004
  • Est. Priority Date: 08/29/2000
  • Status: Expired due to Fees
First Claim
Patent Images

1. A process for time-based proportional control of chemical values in a water treatment system wherein a measured signal value is generated, comprising the steps:

  • selecting an offset sensitivity value; and

    calculating a setpoint offset value (SOV) to determine said measured signal value;

    wherein said measured signal value approximates an ideal proportional control response, and wherein said setpoint offset value is calculated according to the formula

View all claims
  • 10 Assignments
Timeline View
Assignment View
    ×
    ×