×

Method and system for checking track integrity

  • US 6,845,953 B2
  • Filed: 10/10/2002
  • Issued: 01/25/2005
  • Est. Priority Date: 10/10/2002
  • Status: Expired due to Term
First Claim
Patent Images

1. A system for controlling a train, the system comprising:

  • a control unit;

    a warning device in communication with the control unit;

    a brake interface unit, the brake interface unit being in communication with the control unit and a train brake, the brake interface unit being operable to activate the train brake under control of the control unit; and

    a transceiver, the transceiver being located on the train and being in communication with the control unit;

    wherein the control unit is configured to perform the steps of transmitting an interrogation message to a track circuit transceiver associated with a track circuit;

    listening for a response from the track circuit transceiver, the response including an indication as to a condition of a section of track monitored by the track circuit;

    allowing the train to continue if a response with an indication that it is safe for the train to proceed is received; and

    activating the warning device if the response indicates that it is not safe for the train to proceed.

View all claims
  • 6 Assignments
Timeline View
Assignment View
    ×
    ×