×

Schedule-based load estimator and method for electric power and other utilities and resources

  • US 6,865,450 B2
  • Filed: 05/09/2002
  • Issued: 03/08/2005
  • Est. Priority Date: 05/10/2001
  • Status: Active Grant
First Claim
Patent Images

1. A method for determining by a utility energy consumer an estimated load for each time spot in a near-term proposed schedule set offered by a utility energy provider comprising:

  • receiving by said utility energy consumer said near-term proposed schedule set from said utility energy provider;

    obtaining a historical resource usage, a historical unscheduled factors, a historical metering data and a prediction of near-term unscheduled factors of said utility energy consumer;

    correlating said historical resource usage and said historical unscheduled factors to said historical metering data to produce a data structure;

    using said data structure and said prediction of near-term unscheduled factors to produce a near-term load estimate;

    wherein said near-term load estimate represents said estimated load for each time in said near-term proposed schedule.

View all claims
  • 5 Assignments
Timeline View
Assignment View
    ×
    ×