×

Train control system and method of controlling a train or trains

  • US 6,865,454 B2
  • Filed: 07/02/2002
  • Issued: 03/08/2005
  • Est. Priority Date: 07/02/2002
  • Status: Expired due to Term
First Claim
Patent Images

1. A method for authorizing movement of a plurality of trains, the method comprising the steps of:

  • setting an end point and a start point of a block of track dynamically;

    authorizing a first train to occupy the block of track receiving an indication from the first train that a global positioning sensor located at a rear of the first train has passed the end point; and

    authorizing a second train to occupy the block of track.

View all claims
  • 5 Assignments
Timeline View
Assignment View
    ×
    ×