×

Operator location tracking for remote control rail yard switching

  • US 7,239,943 B2
  • Filed: 02/15/2005
  • Issued: 07/03/2007
  • Est. Priority Date: 03/22/2004
  • Status: Active Grant
First Claim
Patent Images

1. A system for generating a rail yard switch list of switch positioning activities for efficient movement of a railyard operator, the system comprising:

  • a first operator control unit (OCU) having a locator for determining a location of the OCU and an associated operator using the OCU during rail yard switching activities;

    a first processor for correlating the rail yard switching activities with a respective location of the OCU in the rail yard to establish a knowledge base of respective preferred locations in the rail yard;

    a memory for storing said knowledge base of preferred locations in the railyard for a library of the switching activities; and

    a second processor for receiving a request for a switch list, accessing the memory and processing the request based on the knowledge base to generate a switch list having a sequence of switching activities organized to consider the physical movement required of an operator to implement the switch list.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×