System and method for managing energy generation equipment
First Claim
Patent Images
1. A method for determining optimal dispatch schemes for an on-site power generation arrangement, said arrangement including at least one generation unit, comprising the steps of:
- (a) receiving forecasted electric or thermal load information associated with said on-site power generation arrangement; and
(b) determining at least one suitable operating point for said at least one generation unit to serve the forecasted load, said determining step including the step of determining a reliability factor associated with serving said load,wherein said step of determining a reliability factor includes the step of determining at least a temperature de-rating of said at least one unit, a load following requirement, percentage of output capacity, unit availability, a reserve margin, or a unit running status.
1 Assignment
0 Petitions
Accused Products
Abstract
A system and method for controlling distributed generation equipment based on remotely derived dispatch schemes improves economics and reliability of operation. The system can adapt to variable changing conditions in real-time to provide adaptable, real-time, site-specific load forecasting. The present invention can include one or more local site controller component(s) for receiving dispatch instructions and comparing the instructions to local information to further optimize operating instructions.
171 Citations
13 Claims
-
1. A method for determining optimal dispatch schemes for an on-site power generation arrangement, said arrangement including at least one generation unit, comprising the steps of:
-
(a) receiving forecasted electric or thermal load information associated with said on-site power generation arrangement; and (b) determining at least one suitable operating point for said at least one generation unit to serve the forecasted load, said determining step including the step of determining a reliability factor associated with serving said load, wherein said step of determining a reliability factor includes the step of determining at least a temperature de-rating of said at least one unit, a load following requirement, percentage of output capacity, unit availability, a reserve margin, or a unit running status. - View Dependent Claims (2, 3, 4, 5, 6, 7)
-
-
8. In a system for serving local energy needs, said system including an on-site power generation arrangement including at least one power generation unit, said system further including a remote controller for determining at least one operating point for said at least one power generation unit, a site controller for controlling operation of said arrangement, said site controller comprising:
-
means for receiving remote dispatch commands associated with said arrangement from said remote controller, said remote dispatch commands including at least operating point information for said arrangement, said operating point information being determined by forecasted thermal or electric load information available to said remote controller; and means for determining appropriate unit-level dispatch commands based on said unit type and further based on site controller-determined real-time site conditions associated with said at least one unit, including at least the unit'"'"'s output, grid draw, load demand, unit status, and grid connection status. - View Dependent Claims (9)
-
-
10. A method for determining optimal dispatch schemes for an onsite power generation arrangement having at least one power generation unit, comprising the steps of:
-
determining whether there is a currently active command for said arrangement; upon there being at least one unit with an active command, determining a device level dispatch value; upon all specified devices being available and dispatched within capacity, setting specified device level output levels to the active command recommendation; determining the total on-site generation requirement; and adjusting specified device output levels to accommodate for differences; and upon said arrangement being grid isolated, ensuring specified reserve margin is met; and compiling and sending at least one dispatch message to said at least one power generation unit in said arrangement. - View Dependent Claims (11)
-
-
12. A method for determining optimal dispatch schemes for an onsite power generation arrangement having at least one power generation unit, comprising the steps of:
-
determining whether there is a currently active command for said arrangement; upon there being no unit with an active command, or upon there being at least one unit with an active command but wherein all specified devices are either not available or not dispatched within capacity, determining site level values; determining total on-site generation requirements; upon said generation requirement being less than the site minimum, dispatching all units to shut down and compiling and sending said dispatch message to said units; upon there being at least one available dispatched generator and no capacity to serve the determined requirement, determining whether the site is grid-connected; upon being grid-isolated, dispatching all generation units to shut down; upon being grid-connected, dispatching all generation units to operate at maximum capacity; and compiling and sending at least one dispatch message to a power generation unit; upon there being at least one available dispatched generator and capacity to serve said determined requirement available, determining available devices to dispatch; dispatching according to part-load distribution; and compiling and sending at least one dispatch message to a power generation unit; upon all dispatched generation units being unavailable; determining devices necessary to serve said determined requirement; upon said dispatched units being determined able to serve said requirement, dispatching according to part-load distribution; and compiling and sending at least one dispatch message to a power generation unit; upon dispatched units not units being determined able to serve said requirement, determining whether the site is grid connected, and upon said site being grid connected,
dispatching all dispatched units to operate at max capacity;upon said site being grid isolated,
attempting to start additional units to meet said requirement; andcompiling and sending at least one dispatch message to a power generation unit. - View Dependent Claims (13)
-
Specification