×

Integrated reservoir optimization

  • US 7,478,024 B2
  • Filed: 03/02/2005
  • Issued: 01/13/2009
  • Est. Priority Date: 02/22/2000
  • Status: Expired due to Fees
First Claim
Patent Images

1. A method of generating a simulator production and reserves forecast, a mechanism representing a process that is active in a reservoir being chosen in response to a first development plan for developing a reservoir, comprising the step of:

  • (a) in response to a history calibrated model, an implementation plan of said mechanism, and a set of constraints, executing a simulator production and reserves forecast model and, responsive thereto, generating a simulator production and reserves forecast representing a manner by which said reservoir responds to said first development plan, wherein said set of constraints is selected from a group consisting of;

    production objectives, sales and transport constraints, rig and equipment availability, injectant constraints, processing constraints, well capacity constraints, and proposed plan of development.

View all claims
  • 0 Assignments
Timeline View
Assignment View
    ×
    ×