Method and system for treating a subterranean formation using diversion
First Claim
Patent Images
1. A method, comprising:
- establishing fluid connectivity between a wellbore and a first target zone, and between the wellbore and a second target zone, wherein the first target zone and second target zone comprise zones for treatment within a subterranean formation intersected by a wellbore, wherein the second target zone is above the first target zone;
positioning a coiled tubing into the wellbore;
performing a first treatment step on the first target zone, wherein the first treatment step comprises contacting a treated zone with a treatment fluid;
performing a second treatment step on the first target zone, wherein the second treatment step comprises introducing a diversion agent comprising a degradable material to the treated zone;
performing the first treatment step on the second target zone;
degrading the diversion agent after the performing the first treatment step on the second target zone; and
measuring a wellbore parameter wherein measuring comprises measuring microseismic activity.
1 Assignment
2 Petitions
Accused Products
Abstract
A method well treatment includes establishing fluid connectivity between a wellbore and at least one target zone for treatment within a subterranean formation, which is intersected by a wellbore. The method includes deploying coiled tubing into the wellbore and introducing a treatment composition into the wellbore. The method includes contacting a target zone within the subterranean formation with the treatment composition, introducing a diversion agent through the coiled tubing to an interval within a wellbore and repeating the introduction of the treatment, the contacting of the target zone and the introduction of the diversion agent for more than one target zone.
85 Citations
13 Claims
-
1. A method, comprising:
-
establishing fluid connectivity between a wellbore and a first target zone, and between the wellbore and a second target zone, wherein the first target zone and second target zone comprise zones for treatment within a subterranean formation intersected by a wellbore, wherein the second target zone is above the first target zone; positioning a coiled tubing into the wellbore; performing a first treatment step on the first target zone, wherein the first treatment step comprises contacting a treated zone with a treatment fluid; performing a second treatment step on the first target zone, wherein the second treatment step comprises introducing a diversion agent comprising a degradable material to the treated zone; performing the first treatment step on the second target zone; degrading the diversion agent after the performing the first treatment step on the second target zone; and measuring a wellbore parameter wherein measuring comprises measuring microseismic activity. - View Dependent Claims (8, 9, 10, 11)
-
-
2. The method of 1, wherein the wellbore is cased, the method further comprising perforating the casing.
- 3. The method of 1, wherein the treatment composition comprises a stimulation fluid.
-
5. The method of 1, wherein at least a portion of the wellbore comprises a generally horizontal section.
-
6. The method of 1, wherein the diversion agent comprises fiber.
-
7. The method of 1, wherein a portion of the wellbore is deviated or horizontal.
-
12. A method, comprising:
-
establishing fluid connectivity between a wellbore and a first target zone, and between the wellbore and a second target zone, wherein the first target zone and second target zone comprise zones for treatment within a subterranean formation intersected by a wellbore, wherein the second target zone is above the first target zone; positioning a coiled tubing into the wellbore; performing a first treatment step on the first target zone, wherein the first treatment step comprises contacting a treated zone with a treatment fluid; performing a second treatment step on the first target zone, wherein the second treatment step comprises introducing a diversion agent comprising a degradable material to the treated zone and wherein the diversion agent is stored in the coiled tubing between acts of introducing the diversion agent to an interval; performing the first treatment step on the second target zone; degrading the diversion agent after the performing the first treatment step on the second target zone; and measuring a wellbore parameter wherein measuring comprises measuring microseismic activity.
-
-
13. A method, comprising:
-
establishing fluid connectivity between a wellbore and a first target zone, and between the wellbore and a second target zone, wherein the first target zone and second target zone comprise zones for treatment within a subterranean formation intersected by a wellbore, wherein the second target zone is above the first target zone; positioning a coiled tubing into the wellbore; performing a first treatment step on the first target zone, wherein the first treatment step comprises contacting a treated zone with a treatment fluid; performing a second treatment step on the first target zone, wherein the second treatment step comprises introducing a diversion agent comprising a degradable material to the treated zone; performing the first treatment step on the second target zone; degrading the diversion agent after the performing the first treatment step on the second target zone; and measuring a wellbore parameter wherein measuring comprises measuring microseismic activity and measuring a parameter indicative of diversion.
-
Specification