×

Full-bridge and half-bridge compatible driver timing schedule for direct drive backlight system

  • US 7,965,046 B2
  • Filed: 12/15/2009
  • Issued: 06/21/2011
  • Est. Priority Date: 04/01/2004
  • Status: Expired due to Fees
First Claim
Patent Images

1. A method to flexibly control a half-bridge or a full-bridge switching network in a backlight inverter, the method comprising generating at least four driving signals with alternating states to control the switching network, wherein the first and the second driving signals are substantially identical with an 180°

  • phase shift, the third and the fourth driving signals have rising edges that precede respective rising edges of the first and the second driving signals by a first duration, and the third and the fourth driving signals have falling edges that trail respective falling edges of the first and the second driving signals by a second duration.

View all claims
  • 5 Assignments
Timeline View
Assignment View
    ×
    ×