×

User-input scheduling of synchronization operation on a mobile device based on user activity

  • US 7,996,028 B2
  • Filed: 08/31/2010
  • Issued: 08/09/2011
  • Est. Priority Date: 11/05/2002
  • Status: Active Grant
First Claim
Patent Images

1. A mobile device, comprising:

  • a synchronization component configured to perform synchronization operations that synchronize data between the mobile device and a computing device over a wireless link;

    a synchronization schedule comprising a peak time period and a non-peak time period for performing the synchronization operations;

    a user interface, comprising;

    a first input component configured to designate a time period throughout a day as the peak time period or the non-peak time period; and

    a second input component configured to set at least one frequency at which the synchronization operations are to be performed during the peak time period, during the non-peak time period, or during both the peak time period and the non-peak time period; and

    a processor configured to be utilized by the synchronization component to facilitate the performance of the synchronization operations.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×