×

Power meter arrangement

  • US 8,543,344 B2
  • Filed: 12/21/2010
  • Issued: 09/24/2013
  • Est. Priority Date: 12/21/2010
  • Status: Active Grant
First Claim
Patent Images

1. An electric power meter arrangement, comprising:

  • a metrology unit that is configured to be coupled to a power line, to determine a power consumption, and to provide measurement data representing the power consumption;

    a programmable control unit including a memory that stores software configured to run on the control unit;

    a security unit coupled to the control unit by a communications link, the security unit configured to store at least one key and to determine whether the software stored in the memory of the programmable control unit has been altered without authorization; and

    a switching circuit comprising at least one switching element configured to be connected to the power line and configured to be switched on or off dependent on a drive signal received by the switching circuit, wherein the security unit is configuredto receive drive information for the switching circuit from the control unit,to check a validity of the drive information, andto generate the drive signal dependent on the drive information only if the drive information has been determined to be valid.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×