Method of estimating the maximum power generation capacity and for controlling a specified power reserve of a single cycle or combined cycle gas turbine power plant, and a power generating system for use with said method

  • US 8,620,482 B2
  • Filed: 12/23/2010
  • Issued: 12/31/2013
  • Est. Priority Date: 06/26/2008
  • Status: Expired due to Fees
First Claim
Patent Images

1. A method of estimating the maximum power generation capacity of a gas turbine power plant having a microprocessor coupled to a memory arranged as a controller which regulates an operation of the power plant, the method comprising the controller:

  • calculating an actual power output and a maximum power generation capacity of the gas turbine power plant based on a mathematical model of the gas turbine power plant;

    measuring the actual power output of the gas turbine power plant;

    comparing the calculated actual power output and the measured power output to derive a model-estimation error;

    processing the model-estimation error to generate a correction signal; and

    applying the correction signal to the calculated maximum power generation capacity to obtain a corrected estimate of the maximum power generation capacity of the gas turbine power plant.