×

Optimization of energy storage device usage in wind energy applications

  • US 8,688,281 B2
  • Filed: 08/31/2010
  • Issued: 04/01/2014
  • Est. Priority Date: 08/31/2010
  • Status: Active Grant
First Claim
Patent Images

1. A power production system comprising:

  • a first wind farm comprising a plurality of wind turbines;

    an energy storage device located at a first physical location at the first wind farm and configured to serve a first energy storage requirement at the first wind farm; and

    a supervisory controller configured to;

    upon determining that an attribute of the energy storage device is less than or equal to a threshold for the first energy storage requirement, schedule the energy storage device for physical relocation from the first physical location to a second physical location to service a second energy storage requirement at one or more of the first wind farm and a second wind farm; and

    communicate with the energy storage device at the second physical location.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×