×

Systems and methods for detecting and correcting a suboptimal operation of one or more inverters in a multi-inverter system

  • US 8,922,061 B2
  • Filed: 07/20/2010
  • Issued: 12/30/2014
  • Est. Priority Date: 03/22/2010
  • Status: Active Grant
First Claim
Patent Images

1. A method comprising:

  • receiving first power output information from a maximum power point tracking (MPPT) device configured to track a maximum power point of a solar power production system;

    wherein the solar power production system contains a plurality of direct current (DC) to DC converting devices each connected with at least one of a plurality of solar panel units within the solar power production system;

    making a determination, from the first power output information, that maximum power point tracking performed by the MPPT device on the solar power production system has been trapped at a first state of operating the solar power production system for a predetermined period of time, the first state being sub-optimal for the solar power production system; and

    based on the determination, transmitting a first instruction to a first device, selected from the group consisting of the MPPT device and the plurality of DC to DC converting devices, to change a control operation of the first device.

View all claims
  • 6 Assignments
Timeline View
Assignment View
    ×
    ×