×

Gradational insertion of an artificial lift system into a live wellbore

  • US 9,080,412 B2
  • Filed: 10/15/2012
  • Issued: 07/14/2015
  • Est. Priority Date: 10/24/2011
  • Status: Active Grant
First Claim
Patent Images

1. A method of inserting a downhole assembly into a live wellbore, comprising:

  • assembling a pressure control assembly (PCA) onto a production tree of the live wellbore;

    inserting a first deployment section of the downhole assembly into a lubricator;

    landing the lubricator onto the PCA;

    connecting the lubricator to the PCA;

    lowering the first deployment section into the PCA;

    engaging a clamp of the PCA with the first deployment section;

    after engaging the clamp, closing an isolation valve of the PCA, thereby isolating an upper portion of the PCA from a lower portion of the PCA;

    after isolating the PCA, removing the lubricator from the PGA;

    connecting a second deployment section to the first deployment section;

    connecting a third deployment section to the second deployment section;

    inserting a fourth deployment section of the downhole assembly into the lubricator;

    landing the lubricator onto the PCA;

    connecting the lubricator to the PCA;

    opening the isolation valve of the PCA;

    lowering the fourth deployment section into the PCA to a position adjacent a top of the third deployment section; and

    while the lubricator is connected to the PCA;

    orienting a lower flange of the fourth deployment section with an upper flange of the third deployment section to align threaded fasteners of the upper flange with threaded sockets of the lower flange;

    rotating the oriented third and fourth deployment sections to align one of the threaded fasteners with a wrench of the PCA;

    engaging the wrench with the aligned threaded fastener and operating the wrench to screw the threaded fastener into the threaded socket;

    disengaging the wrench from the threaded fastener;

    incrementally rotating the third and fourth deployment sections to align another one of the threaded fasteners with the wrench; and

    repeating the engaging, disengaging, and incrementally rotating steps until the flanged connection between the third and fourth deployment sections is assembled.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×