×

Renewable energy control systems and methods

  • US 9,218,035 B2
  • Filed: 02/09/2013
  • Issued: 12/22/2015
  • Est. Priority Date: 02/10/2012
  • Status: Active Grant
First Claim
Patent Images

1. A system, comprising:

  • at least one cluster including a plurality of servers; and

    a power manager configured to switch at least a portion of the plurality of servers between a renewable energy supply (RES) and a utility energy supply based at least in part upon a budget level corresponding to an amount of power available from the RES and a load power consumption of the at least one cluster, where the power manager comprises a central switch controller configured to switch the at least a portion of the plurality of servers based upon a switch assignment determined by a switch scheduler based at least in part upon switching history and load history.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×