×

Metering and measuring point system for measuring and metering electrical energy and method

  • US 9,222,803 B2
  • Filed: 11/25/2009
  • Issued: 12/29/2015
  • Est. Priority Date: 11/27/2008
  • Status: Active Grant
First Claim
Patent Images

1. A metering and measuring point system for metering and measuring electrical energy consumption or generation, the system comprising:

  • at least one stationary connection device connected to a power grid, the at least one stationary connection device being configured to have electrical energy consumed by a consumption unit drawn off from the at least one stationary connection device or to have the electrical energy generated by a generation unit fed into the at least one stationary connection device, wherein the at least one stationary connection device comprises;

    an identifier configured to identify a grid connection holder associated with the at least one stationary connection device, the grid connection holder being other than a utility provider; and

    a socket; and

    at least one identifiable mobile functional unit configured to be electrically connected to the socket, wherein the at least one identifiable mobile functional unit comprises;

    a detecting device configured to detect the identifier;

    an identifiable device configured to meter and measure the electrical energy drawn off from or fed into the at least one stationary connection device at the socket;

    a storing device configured to store data indicative of the metered and measured electrical energy and the detected identifier; and

    a reading device configured to read out the stored data in the storing device, whereinthe at least one identifiable mobile functional unit is communicatively coupled with a database stored on a central computer or otherwise outside the at least one stationary connection device, and in which additional data regarding the at least one stationary connection device is stored,the database is configured to store information for identifying the grid connection holder, andthe central computer is configured to;

    adjust a quantity of electrical energy usage allocated to a first account associated with the grid connection holder by an amount of the electrical energy usage based on the data indicative of the metered and measured electrical energy and the detected identifier, andallocate the amount of the electrical energy usage based on the communicated data to a second account, different from the first account, the second account being associated with the at least one identifiable mobile functional unit.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×