×

Power line management system

  • US 9,562,925 B2
  • Filed: 02/13/2013
  • Issued: 02/07/2017
  • Est. Priority Date: 02/14/2012
  • Status: Active Grant
First Claim
Patent Images

1. A method comprising:

  • obtaining, using a first sensor unit coupled to a first power line in a power distribution system, at least one first measurement of at least one inertial property of the first power line;

    obtaining, using a second sensor unit different from the first sensor unit and coupled to a second power line different from the first power line, at least a second measurement of at least one inertial property of the second power line; and

    detecting an environmental condition affecting multiple power lines in an area at least in part by jointly analyzing a first feature obtained from the at least one first measurement and a second feature obtained from the at least one second measurement,wherein detecting the environmental condition comprises;

    generating the first feature from the at least one first measurement, the first feature indicating presence of sag in the first power line;

    generating the second feature from the at least one second measurement, the second feature indicating presence of sag in the second power line; and

    correlating the first feature and the second feature to infer that the environmental condition is affecting multiple power lines in the area.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×