×

Using demand side resources to provide frequency regulation

  • US 9,748,770 B2
  • Filed: 12/06/2013
  • Issued: 08/29/2017
  • Est. Priority Date: 12/07/2012
  • Status: Active Grant
First Claim
Patent Images

1. A method comprising:

  • at each electrical load of an aggregation of loads, generating a load status report using a microprocessor or microcontroller, the load status report comprising an urgency value indicating how critical it is for the electrical load to run and a power level indicating how much power will be drawn by the electrical load if the load runs;

    conveying the load status reports from the electrical loads to an aggregation dispatch controller comprising an electronic data processing device;

    at the aggregation dispatch controller, generating a dispatch signal based on the generated load status reports and information indicative of electrical frequency;

    transmitting the dispatch signal from the aggregation dispatch controller to the electrical loads of the aggregation; and

    at each electrical load of the aggregation, operating the load at the reported power level if the reported urgency value satisfies the dispatch signal and not operating the load at the reported power level if the reported urgency value does not satisfy the dispatch signal;

    wherein an electrical load submits both a more urgent load status report and a less urgent load status report, and the operating at the electrical load comprises;

    operating the load at the power level of the less urgent load status report if the urgency values of both the less urgent load status report and the more urgent load status report satisfies the dispatch signal;

    operating the load at the power level of the more urgent load status report if the urgency value of the more urgent load status report satisfies the dispatch signal but the urgency value of the less urgent load status report does not satisfy the dispatch signal; and

    not operating the load at all if the urgency value of the less urgent load status report does not satisfy the dispatch signal and the urgency value of the more urgent load status report does not satisfy the dispatch signal.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×