1. A power plant, comprising:
- a heat source device configured to heat a low-temperature fluid using a heat source medium to generate a high-temperature fluid;
a steam generator for generating steam by thermal exchange with the high-temperature fluid;
a steam turbine to be driven by the steam;
an adjuster configured to operate to adjust a plant operation amount;
a first detector which measures the plant operation amount;
a second detector which measures a plant state amount; and
a control device configured to;
input the plant operation amount measured by the first detector and input the plant state amount measured by the second detector, and calculate a predicted state amount of the plant based on the plant operation amount and the plant state amount and calculate a predicted value for at least one constraint to be used to control the activation of the steam turbine based on the predicted state amount of the plant,calculate, based on an initial state amount of the plant, which is calculated based on a measurement of the second detector, an activation control parameter, which is a coefficient included in a function to set an activation schedule for the heat source, to be used to control the activation of the steam turbine,calculate at least two requested operation amounts based on the predicted value for the at least one constraint and the activation control parameter, so that the constraint does not exceed a predetermined limit,select a minimum requested operation amount of the plant among the calculated at least two requested operation amounts, andcalculate a deviation between the predicted state amount of the plant or temporal data of the predicted value of the at least one constraint and an actual state amount of the plant and correct the predicted state amount of the plant or the predicted value of the constraint based on the deviation,wherein the adjuster operates based on the minimum requested operation amount of the plant selected by the low value selector, thereby adjusting the plant operation amount.
3 Assignments
0 Petitions
Accused Products
Abstract
Provided is a steam turbine plant activation control device that can flexibly handle an initial state amount of a steam turbine plant and activate a steam turbine at a high speed. The activation control device 21 for the steam turbine plant includes a heat source device 1 configured to heat a low-temperature fluid using a heat source medium and generate a high-temperature fluid, a steam generator 2 for generating steam by thermal exchange with the high-temperature fluid, a steam turbine 3 to be driven by the steam, and adjusters 11, 12, 13, 14, 15 configured to adjust operation amounts of the plant.
6 Citations
11 Claims
-
1. A power plant, comprising:
-
a heat source device configured to heat a low-temperature fluid using a heat source medium to generate a high-temperature fluid; a steam generator for generating steam by thermal exchange with the high-temperature fluid; a steam turbine to be driven by the steam; an adjuster configured to operate to adjust a plant operation amount; a first detector which measures the plant operation amount; a second detector which measures a plant state amount; and a control device configured to; input the plant operation amount measured by the first detector and input the plant state amount measured by the second detector, and calculate a predicted state amount of the plant based on the plant operation amount and the plant state amount and calculate a predicted value for at least one constraint to be used to control the activation of the steam turbine based on the predicted state amount of the plant, calculate, based on an initial state amount of the plant, which is calculated based on a measurement of the second detector, an activation control parameter, which is a coefficient included in a function to set an activation schedule for the heat source, to be used to control the activation of the steam turbine, calculate at least two requested operation amounts based on the predicted value for the at least one constraint and the activation control parameter, so that the constraint does not exceed a predetermined limit, select a minimum requested operation amount of the plant among the calculated at least two requested operation amounts, and calculate a deviation between the predicted state amount of the plant or temporal data of the predicted value of the at least one constraint and an actual state amount of the plant and correct the predicted state amount of the plant or the predicted value of the constraint based on the deviation, wherein the adjuster operates based on the minimum requested operation amount of the plant selected by the low value selector, thereby adjusting the plant operation amount. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11)
-
Specification