×

System for updating a calendar or task status in home care scheduling via telephony

  • US 9,824,334 B2
  • Filed: 07/11/2011
  • Issued: 11/21/2017
  • Est. Priority Date: 07/11/2011
  • Status: Active Grant
First Claim
Patent Images

1. A telephony accessible calendar system for use in a home care scheduling system for scheduling multiple daily work shifts of home care providers, comprising:

  • a scheduling computer system configured to organize a plurality of work shifts of remote operating home care workers and specify tasks for the work shifts;

    a confirmation computer system configured to;

    receive, over a voice telephony network, a clock in call from a worker of the remote operating home care workers for a work shift of the plurality of work shifts of the worker;

    in response to receipt of the clock in call, transmit to the worker, over the voice telephony network, a voice reading of tasks assigned to the worker for the work shift for the worker without issuing a prompt to at least one completion status update;

    in response to receipt of a first call subsequent to the clock in call, transmit to the worker, over the voice telephony network, a voice reading of the tasks assigned to the worker for the work shift of the worker, with the voice reading including prompts to provide at least one completion status update;

    receive, over the voice telephony network, at least one completion status update; and

    receive, over the voice telephony network, an electronic signature including at least one of a voice signature and a keypress signature affirming the completion status update.

View all claims
  • 12 Assignments
Timeline View
Assignment View
    ×
    ×