×

Information processing device, power-demanding object, information processing method, and non-transitory storage medium

  • US 9,881,270 B2
  • Filed: 09/29/2014
  • Issued: 01/30/2018
  • Est. Priority Date: 10/31/2013
  • Status: Active Grant
First Claim
Patent Images

1. An information processing device comprising:

  • a time range setting unit that sets an operation startable time point at which an operation can be started and a target operation end time point which is the latest time point among time points at which the operation is to be ended, with respect to each of a plurality of power demanding objects that generates power demand;

    a necessary operation time setting unit that sets a necessary operation time which corresponds to a length of a time period during which the operation is to be performed, which is equal to or shorter than a time period from the operation startable time point to the target operation end time point, with respect to each of the plurality of power demanding objects;

    a shape information acquisition unit that acquires shape information indicating an assumed shape of a transition line that represents transition in the amount of supplied power in a target period; and

    a demand transition setting unit that sets power demand transition information indicating transition in an electric energy demand in the target period so that the necessary operation time is obtained and so that the transition in the electric energy demand generated by the plurality of power demanding objects being operated accords with the assumed shape,wherein the demand transition setting unit updates the power demand transition information when the shape information acquisition unit updates the shape information, andthe information processing device further comprises;

    a demand transition preliminary information generation unit that generates power demand transition preliminary information used in further updating the power demand transition information based on the power demand transition information after being updated and the power demand transition information before being updated,wherein the power demand transition information is a function that uses time as a variable, andwherein the demand transition preliminary information generation unit generates the power demand transition preliminary information based on the sum of a function obtained by multiplying the power demand transition information after being updated by a first coefficient and a function obtained by multiplying the power demand transition information before being updated by a second coefficient.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×