×

Background task resource control

  • US 9,952,903 B2
  • Filed: 10/14/2015
  • Issued: 04/24/2018
  • Est. Priority Date: 01/20/2012
  • Status: Active Grant
First Claim
Patent Images

1. A computing system comprising:

  • one or more processors;

    one or more hardware storage device having stored computer-executable instructions which are executable by the one or more processors for causing the computing system to;

    assign an application resource pool to an application with a predetermined quantity of available consumable resource units associated with a resource available to the computing system for consumption by one or more tasks of the application;

    determine that the assigned application resource pool is exhausted in response to determining that all of the available consumable resource units associated with the assigned application resource pool are consumed by the one or more tasks of the application and that there are no available consumable resource units remaining in the application resource pool; and

    restrict the one or more tasks of the application from utilizing the resource in response to determining that the assigned application resource pool is exhausted.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×