Preventative maintenance system

  • US 9,975,172 B2
  • Filed: 06/15/2007
  • Issued: 05/22/2018
  • Est. Priority Date: 06/16/2006
  • Status: Active Grant
First Claim
Patent Images

1. A real time preventative maintenance system for real time preventative maintenance of a molding system, the real time preventative maintenance system comprising:

  • a processor configured to execute a preventative maintenance logic, the preventative maintenance logic directing the processor to;

    receive operational data, in real time, from one or more sensors attached to one or more corresponding sub-assemblies and components of the molding system;

    identify indicators, based on the one or more sensors being monitored, of a potential premature failure of the one or more corresponding sub-assemblies and components of the molding system;

    determine that the operational data indicates a condition outside of an operational threshold that can lead to the potential premature failure of the one or more corresponding sub-assemblies or components of the molding system;

    automatically schedule preventative maintenance of the molding system based on the operational data before an actual failure of the one or more corresponding sub-assemblies or components of the molding system at a time that is best fit to a production cycle of the molding system;

    throttle operation of the molding system when a determination is made that the operational data indicates a condition outside of an operational threshold that can lead to the potential failure of the one or more corresponding sub-assemblies or components of the molding system; and

    update the operational threshold based on one or more events comprising environmental changes, customer data, manufacturer upgrade and geographical location based upon real time use of the molding system.