Method for converting kvm/km system

Method for converting kvm/km system

CN
  • CN 101,685,344 B
  • Filed: 09/01/2009
  • Issued: 12/14/2011
  • Est. Priority Date: 09/09/2008
  • Status: Active Grant
First Claim
Patent Images

1. the changing method of a computer switch system is characterized in that it may further comprise the steps:

  • (S1) initialization one cursor control device, at least two host computers, a keyboard, two corresponding with this two host computer at least respectively display device are coupled to one by a KVM switch;

    (S2) judge whether a present host computer and corresponding display device thereof need to be performed, if yes, execution in step (S3) then, if not, execution in step (S4) then, wherein, this host computer and corresponding display device thereof are and this cursor control device and the electric connection of this keyboard;

    (S3) this host computer and corresponding display device thereof are operated, subsequently execution in step (S11);

    (S4) judge whether one first host computer needs to operate, if yes, execution in step (S5) then, if not, execution in step (S7) then;

    (S5) become to making a switch that is disposed on this cursor control device to move to first particular orientation;

    (S6) this first host computer is operated, subsequently execution in step (S11);

    (S7) judge whether one second host computer needs to operate, if yes, execution in step (S8) then, if not, execution in step (S10) then;

    (S8) become to making a switch that is disposed on this cursor control device to move to second particular orientation;

    (S9) this second host computer is operated, subsequently execution in step (S11);

    (S10) continue to judge whether N platform host computer needs to operate, N is the integer greater than 2, and the logic class of its operating process arrives step (S10) like step (S4);

    (S11) complete operation;

    (S12) judge whether other host computer and corresponding display device thereof need to operate, and if yes, then get back to step (S2), if not, execution in step (S13) then;

    And(S13) finish.