System linkage method after train jam in rail transportation

System linkage method after train jam in rail transportation

  • CN 101,913,371 B
  • Filed: 09/03/2010
  • Issued: 05/14/2014
  • Est. Priority Date: 09/03/2010
  • Status: Active Grant
First Claim
Patent Images

1. tackle for track traffic the system interlink disposal route that train blocks for one kind, the method for the underground station of track traffic, parking lot, power transformation in one'"'"'s power control center there is the interlock control after train blocks in interval, it is characterized in that described method comprises:

  • (1) professional system arranging in described station, interval and control center is intercoupled, above-mentioned professional system comprises train automatic monitoring system, screen door, broadcast system, passenger information system, electromechanical equipment supervisory system and comprehensive monitoring system;

    (2) described train automatic monitoring system monitoring train operation state, and the gathered train positional information of being obstructed is sent to the described comprehensive monitoring system of described control center;

    (3) the described comprehensive monitoring system of described control center gathers according to step (2) positional information of being obstructed and selects startup;

    the interval blocking model in station or Gui Hang district, station blocking model;

    The concrete steps of the interval blocking model in wherein said station are;

    (a) described comprehensive monitoring system, according to blocking occurrence positions, is determined the two adjacent stations of blocking occurrence positions;

    (b) described control center comprehensive monitoring system control start described electromechanical equipment supervisory system, to the interval air-supply at determined two adjacent stations in step (a);

    (c) described control center comprehensive monitoring system control start broadcast system, reports blockage information to determined two adjacent stations in step (a);

    (d) described control center comprehensive monitoring system control start passenger information system, issues blockage information to determined two adjacent stations in step (a);

    (e) described control center comprehensive monitoring system presenting bank is adjusted, and is adjusted by train automatic monitoring system terminal and is carried out corresponding detaining car and operate wanting to enter the follow-up train of this section by row;

    (f) described control center comprehensive monitoring system is pointed out the yardman that takes precautions against natural calamities, and according to circumstances determines whether open interval emergency lighting and road man is implemented to emergency evacuation.2. a kind of system interlink disposal route of tackling train obstruction for track traffic according to claim 1, is characterized in that the concrete steps of Gui Hang district, described station blocking model are;

    (a) there is station according to blocking occurrence positions, determine to block in described comprehensive monitoring system;

    (b), there is the air-supply of Gui Hang district, station to blocking in described control center comprehensive monitoring system control start dynamo-electric equipment monitoring system;

    (c), there is station and report blockage information in described control center comprehensive monitoring system control start broadcast system to blocking;

    (d), there is station and issue blockage information in described control center comprehensive monitoring system control start passenger information system to blocking;

    (e) described control center comprehensive monitoring system presenting bank is adjusted, and adjusts the follow-up train that Gui Hang district, station occurs wanting to enter this obstruction by train automatic monitoring system terminal to carry out detaining car operate by row;

    (f) described control center comprehensive monitoring system is pointed out the yardman that takes precautions against natural calamities, and according to circumstances determines that the screen door of one side platform occurs to block whether to open Gui Hang district, station, and road man is implemented to emergency evacuation.

View all claims
    ×
    ×