Execute the change process based on strategy

Execute the change process based on strategy

  • CN 103,403,674 B
  • Filed: 03/09/2011
  • Issued: 12/14/2018
  • Est. Priority Date: 03/09/2011
  • Status: Active Grant
First Claim
Patent Images

1. a kind of method for changing process based on strategy execution, comprising:

  • The request for the component that (102) change in infrastructure is received by the system with processor;

    In response to the request, the change process that (104) have multiple stages is executed by the system, wherein changing process packetIt includes;

    Based at least one strategy is accessed, determine whether the transformation between (106) multiple stages is allowed to, wherein the determining packetTrigger policy regulation engine is included at least one described strategy of special transition application between the successive stages for multiple stages;

    WithIn response to determining that the violation of at least one strategy will be called due to special transition by policy rule engine(108) abnormality processing.

View all claims
    ×
    ×

    Thank you for your feedback

    ×
    ×